This page contains the Site-related documents available at the public library and the GM Plant Lobby repository. This repository contains documents that are very large. Every document is provided in its entirety. Some documents are also broken into logical units called "Splits". These Splits are parts of the entire document, and are more quickly downloaded to your computer.

It is recommended to perform the following procedures in order to view any single document:
  1. Using your mouse, "right-click" on the document you wish to view;
  2. Select "Save Target As ...", and identify where you want to save the document on your computer;
  3. Click the "Save" button; and
  4. Once the document has been saved on your computer, open the document from your computer.
Document sizes are large, and the time to download depends upon your internet connection speed.

Copies of all Documents are available at the public library and the GM Plant lobby.

Voluntary Corrective Action Agreement
Voluntary Corrective Action Agreement3/20/20010.4 MB2 min
Performance Based Corrective Action Agreement10/01/20020.7 MB2 min
Schedule Extension for Submittal of Final Corrective Measures Proposal04/05/20070.1 MB1 min


Administrative Order On Consent (effective on July 31, 2003)
AOC for Removal Action8/14/2003


CERCLA Monthly Progress Reports
July 2003 Progress Report 8/19/2003 3.4 MB 17 min
 
August 2003 Progress Report 9/10/2003 0.2 MB 1 min
 
September 2003 Progress Report 10/14/2003 0.2 MB 1 min
 
October 2003 Progress Report 11/14/2003 1.9 MB 9 min
 
November 2003 Progress Report 12/12/2003 2 MB 10 min
 
December 2003 Progress Report 1/15/2004 1.9 MB 9 min
 
January 2004 Progress Report 2/13/2004 2.5 MB 12 min
 
February 2004 Monthly Progress Report 3/15/2004 4.8 MB 24 min
 
March 2004 Monthly Progress Report 4/15/2004 2.6 MB 13 min
 
April 2004 Monthly Progress Report 5/13/2004 4.7 MB 23 min
 
May 2004 Monthly Progress Report 6/14/2004 8.5 MB 43 min
 
June 2004 Monthly Progress Report 7/14/2004 5.9 MB 29 min
 
July 2004 Monthly Progress Report 8/14/2004 6.5 MB 33 min
 
August 2004 Monthly Progress Report 9/17/2004 8.7 MB 44 min
 
September 2004 Monthly Progress Report 10/15/2004 8.1 MB 41 min
 
October 2004 Monthly Progress Report 11/15/2004 13.5 MB 68 min
 
November 2004 Monthly Progress Report 12/13/2004 13.5 MB 68 min
 
December 2004 Monthly Progress Report 1/15/2005 16.9 MB 85 min
 
January 2005 Monthly Progress Report 2/15/2005 14 MB 71 min
 
February 2005 Monthly Progress Report 3/11/2005 16.7 MB 84 min
 
March 2005 Monthly Progress Report 4/15/2005 17.7 MB 89 min
 
April 2005 Monthly Progress Report 5/13/2005 21.2 MB 107 min
 
May 2005 Monthly Progress Report 6/14/2005 21.6 MB 109 min
 
June 2005 Monthly Progress Report 7/14/2005 13.4 MB 68 min
 
July 2005 Monthly Progress Report 8/14/2005 22 MB 111 min
 
August 2005 Monthly Progress Report 9/14/2005 26.9 MB 136 min
 
September 2005 Monthly Progress Report 10/14/2005 25.5 MB 129 min
 
October 2005 Monthly Progress Report 11/14/2005 23.9 MB 121 min
 
November 2005 Monthly Progress Report 12/14/2005 16.7 MB 84 min
 
December 2005 Monthly Progress Report 1/13/2006 10.6 MB 53 min
 
January 2006 Monthly Progress Report 2/14/2006 15.8 MB 80 min
 
February 2006 Monthly Progress Report 3/14/2006 24.1 MB 122 min
 
March 2006 Monthly Progress Report 4/13/2006 19 MB 96 min
 
April 2006 Monthly Progress Report 5/12/2006 19.7 MB 100 min
 
May 2006 Monthly Progress Report 6/14/2006 14.4 MB 73 min
 
June 2006 Monthly Progress Report 7/14/2006 17.8 MB 90 min
 
July 2006 Monthly Progress Report 8/14/2006 8.8 MB 44 min
 
August 2006 Monthly Progress Report 9/14/2006 26.4 MB 134 min
 
September 2006 Monthly Progress Report 10/13/2006 18.5 MB 93 min
 
October 2006 Monthly Progress Report 11/14/2006 10.4 MB 52 min
 
November 2006 Monthly Progress Report 12/15/2006 14.7 MB 74 min
 
December 2006 Monthly Progress Report 1/12/2007 10.6 MB 53 min
 
January 2007 Monthly Progress Report 2/15/2007 9.1 MB 46 min
 
February 2007 Monthly Progress Report 3/14/2007 5.3 MB 26 min
 
March 2007 Monthly Progress Report 4/13/2007 18.8 MB 95 min
 
April 2007 Monthly Progress Report 5/14/2007 7.4 MB 37 min
 
May 2007 Monthly Progress Report 6/14/2007 36.9 MB 187 min
 
June 2007 Monthly Progress Report 7/13/2007 10.1 MB 51 min
 
July 2007 Monthly Progress Report 8/14/2007 8.2 MB 41 min
 
August 2007 Monthly Progress Report 9/14/2007 9.7 MB 49 min
 
September 2007 Monthly Progress Report 10/12/2007 8.4 MB 42 min
 
October 2007 Monthly Progress Report 11/14/2007 7.5 MB 38 min
 
November 2007 Monthly Progress Report 12/14/2007 6.2 MB 31 min
 
December 2007 Monthly Progress Report 1/14/2008 4.8 MB 24 min
 
January 2008 Monthly Progress Report 2/14/2008 5.4 MB 27 min
 
February 2008 Monthly Progress Report 3/14/2008 3.6 MB 18 min
 
March 2008 Monthly Progress Report 4/15/2008 3.5 MB 17 min
 
April 2008 Monthly Progress Report 5/14/2008 6 MB 30 min
 
May 2008 Monthly Progress Report 6/13/2008 8.2 MB 41 min
 
June 2008 Monthly Progress Report 7/14/2008 5.4 MB 27 min
 
July 2008 Monthly Progress Report 8/14/2008 3.7 MB 18 min
 

Creek Soil and Sediment Removal Action Reports
Parcel 22 Removal Action Work Plan 7/18/2003 38.9 MB 197 min
 
Parcel 22 Removal Action Work Plan Drawings 7/18/2003 8.9 MB 45 min
 
Upstream Parcels Removal Action Work Plan 7/18/2003 42.5 MB 215 min
 
Upstream Parcels Removal Action Work Plan Drawings 7/18/2003 14.3 MB 72 min
 
Upstream Parcels Removal Action Work Plan: Addendum No. 1 12/2/2003 6.4 MB 32 min
 
Upstream Parcels Removal Action Work Plan: Addendum No. 2 2/23/2004 0.2 MB 1 min
 
Upstream Parcels Removal Action Work Plan: Addendum No. 3 5/11/2004 2.2 MB 11 min
 
Upstream Parcels Removal Action Work Plan: Addendum No. 4 6/30/2004 0.1 MB < 1 min
 
Upstream Parcels Removal Action Work Plan: Addendum No. 5 10/2/2004 4.3 MB 21 min
 
Site Source Control Work Plan 11/11/2003 14.2 MB 72 min
 
Site Source Control Work Plan: Addendum No. 1 4/21/2004 13.3 MB 67 min
 
Site Source Control Work Plan: Addendum No.2 10/1/2004 16 MB 81 min
 
Site Source Control Work Plan: Addendum No. 3 11/17/2004 3.1 MB 15 min
 
Site Source Control Work Plan: Addendum No. 4 6/22/2005 6.7 MB 34 min
 
Site Source Control Work Plan: Addendum No. 5 11/9/2006 9.6 MB 48 min
 
Site Source Control Work Plan: Addendum No. 6 9/6/2007 19.7 MB 100 min
 
Final Proposed Modification to the Ambient Air Quality Monitoring Plan 11/23/2004 6.8 MB 34 min
 
Master Creek Channel, Vegetation, and Habitat Restoration Plan 11/26/2004 37.7 MB 191 min
 
Downstream Parcels Removal Action Work Plan 5/25/2004 46.8 MB 237 min
 
Downstream Parcels and Parcel 22 Addendum No. 1 5/10/2005 0.2 MB 1 min
 
Downstream Parcels Addendum No. 2 6/22/2006 34.6 MB 175 min
 
Downstream Parcels Removal Action Work Plan Drawings 5/25/2004 50.7 MB 257 min
 

Maps
Pleasant Run And Bailey's Branch Creek Areas 6/14/2002 0.7 MB 3 min
 
Stream Sample Locations KEY MAP 8/9/2002 7.9 MB 40 min
 
Stream Sample Locations Study Area 1 8/9/2002 0.5 MB 2 min
 
Stream Sample Locations Study Area 2 - 1 of 2 8/9/2002 0.2 MB 1 min
 
Stream Sample Locations Study Area 2 - 2 of 2 8/9/2002 0.3 MB 1 min
 
Stream Sample Locations Study Area 3 - 1 of 2 8/9/2002 1.6 MB 8 min
 
Stream Sample Locations Study Area 3 - 2 of 2 8/9/2002 1.3 MB 6 min
 
Stream Sample Locations Study Area 4 - 1 of 2 8/9/2002 1 MB 5 min
 
Stream Sample Locations Study Area 4 - 2 of 2 8/9/2002 0.7 MB 3 min
 
Stream Sample Locations Study Area 5 8/9/2002 0.9 MB 4 min
 
Stream Sample Locations Study Area 6 8/9/2002 1.7 MB 8 min
 
Stream Sample Locations Study Area 7 8/9/2002 0.7 MB 3 min
 
Stream Sample Locations Study Area 8 8/9/2002 0.7 MB 3 min
 
Stream Sample Locations Study Area 9 8/9/2002 2 MB 10 min
 
Stream Sample Locations Study Area 10 8/9/2002 1.5 MB 7 min
 

Off-Site Well Investigation Reports
Off-Site Well Survey & Sampling Work Plan 6/6/2001 2.4 MB 12 min
 
Technical Memorandum Off-Site Residential Well Survey and Sampling 12/9/2002 34.7 MB 176 min
 

Progress Reports
Quarterly Progress Report 1 7/12/2001 0.2 MB 1 min
 
Quarterly Progress Report 2 10/15/2001 2.2 MB 11 min
 
Quarterly Progress Report 3 1/15/2002 3.4 MB 17 min
 
Quarterly Progress Report 4 4/15/2002 2.7 MB 13 min
 
Quarterly Progress Report 5 7/15/2002 0.1 MB < 1 min
 
Quarterly Progress Report 6 10/16/2002 0.2 MB 1 min
 
Quarterly Progress Report 7 1/15/2003 8.8 MB 44 min
 
Quarterly Progress Report 8 4/14/2003 < 0.1 MB < 1 min
 
Quarterly Progress Report 9 7/14/2003 0.4 MB 2 min
 
Quarterly Progress Report 10 10/11/2003 1.7 MB 8 min
 
Quarterly Progress Report 11 1/15/2004 0.1 MB < 1 min
 
Quarterly Progress Report 12 4/15/2004 1.7 MB 8 min
 
Quarterly Progress Report 13 7/12/2004 0.1 MB < 1 min
 
Quarterly Progress Report 14 10/14/2004 0.1 MB < 1 min
 
Quarterly Progress Report 15 1/15/2005 0.3 MB 1 min
 
Quarterly Progress Report 16 4/15/2005 0.1 MB < 1 min
 
Quarterly Progress Report 17 7/14/2005 0.1 MB < 1 min
 
Quarterly Progress Report 18 9/14/2005 1.1 MB 5 min
 
Quarterly Progress Report 19 1/13/2006 0.1 MB < 1 min
 
Quarterly Progress Report 20 4/13/2006 0.7 MB 3 min
 
Quarterly Progress Report 21 7/14/2006 1 MB 5 min
 
Quarterly Progress Report 22 10/13/2006 2.4 MB 12 min
 
Quarterly Progress Report 23 1/12/2007 3.4 MB 17 min
 
Quarterly Progress Report 24 4/13/2007 4 MB 20 min
 
Quarterly Progress Report 25 7/13/2007 3.9 MB 19 min
 
Quarterly Progress Report 26 10/12/2007 3.3 MB 16 min
 
Quarterly Progress Report 27 1/14/2008 2.9 MB 14 min
 
Quarterly Progress Report 28 4/15/2008 1.5 MB 7 min
 
Quarterly Progress Report 29 7/14/2008 1.4 MB 7 min
 

Project Fact Sheets
Project Fact Sheet 1 5/24/2001 2.2 MB 11 min
 
Project Fact Sheet 2 7/16/2001 1.8 MB 9 min
 
Project Fact Sheet 3 2/10/2002 1.6 MB 8 min
 
Project Fact Sheet 4 9/9/2002 0.1 MB < 1 min
 
Project Fact Sheet 5 2/13/2003 0.2 MB 1 min
 
Project Fact Sheet 6 8/11/2003 0.2 MB 1 min
 
Project Fact Sheet 7 1/20/2004 0.5 MB 2 min
 
Project Fact Sheet 8 5/28/2004 2.4 MB 12 min
 
Project Fact Sheet 9 10/28/2004 0.8 MB 4 min
 
Project Fact Sheet 10 3/8/2005 1.8 MB 9 min
 
Project Fact Sheet 11 5/25/2005 2.8 MB 14 min
 
Project Fact Sheet 12 9/30/2005 2.4 MB 12 min
 
Project Fact Sheet 13 1/6/2006 4.2 MB 21 min
 
Project Fact Sheet 14 9/15/2006 4 MB 20 min
 
Project Fact Sheet 15 2/20/2007 3.2 MB 16 min
 
Project Fact Sheet 16 5/24/2007 0.2 MB 1 min
 
Project Fact Sheet 17 9/14/2007 0.6 MB 3 min
 
Project Fact Sheet 18 12/26/2007 0.9 MB 4 min
 
Project Fact Sheet 19 2/27/2008 0.6 MB 3 min
 
Project Fact Sheet 20 6/11/2008 1.5 MB 7 min
 

Public Presentations
January 28, 2004 Public Information Session 1/28/2004 1.1 MB 5 min
 
April 29, 2004 Public Information Session 4/29/2004 5.5 MB 27 min
 
August 5, 2004 Public Information Session 8/5/2004 7.4 MB 37 min
 
October 28, 2004 Public Information Session 10/29/2004 20.9 MB 106 min
 
February 22, 2005 Public Information Session 2/22/2005 17.9 MB 90 min
 
March 31, 2005 Public Information Session 3/31/2005 18.1 MB 91 min
 
June 2, 2005 Public Information Session 6/2/2005 9.8 MB 49 min
 
October 6, 2005 Public Information Session 10/6/2005 16.9 MB 85 min
 
February 2, 2006 Public Information Session 2/2/2006 2.4 MB 12 min
 
June 8, 2006 Public Information Session 6/8/2006 6.3 MB 32 min
 
September 28, 2006 Public Information Session 9/28/2006 4.2 MB 21 min
 
December 7, 2006 Public Information Session 12/7/2006 5.3 MB 26 min
 
March 1, 2007 Public Information Session 3/1/2007 4.6 MB 23 min
 
June 7, 2007 Public Information Session 6/7/2007 3.9 MB 19 min
 
October 11, 2007 Public Information Session 10/11/2007 2.7 MB 13 min
 
December 6, 2007 Public Information Session 12/6/2007 2.9 MB 14 min
 
March 13, 2008 Public Information Session 3/13/2008 2.2 MB 11 min
 
June 19, 2008 Public Information Session 6/19/2008 3.5 MB 17 min
 

RCRA Facility Investigation Reports
Current Conditions Report (Volume I – Text, Figures, and Tables) 5/25/2001 7.2 MB 36 min
 
Current Conditions Report (Volume II - Appendix A through E) (Part 1) 5/25/2001 212.4 MB 1078 min
 
Current Conditions Report (Volume II - Appendix A through E) (Part 2) 5/25/2001 30.8 MB 156 min
 
Current Conditions Report (Volume III - Appendix F and G) (Part 1) 5/25/2001 34.1 MB 173 min
 
Current Conditions Report (Volume III - Appendix F and G) (Part 2) 5/25/2001 140.1 MB 711 min
 
Community Relations Plan 6/6/2001 1.7 MB 8 min
 
Quality Assurance Project Plan 7/18/2001 70.8 MB 359 min
 
RCRA Facility Investigation Work Plan (amended 12/17/2002) 10/29/2001    
 
RCRA Facility Investigation Work Plan Addendum No. 1 11/8/2002 4.8 MB 24 min
 
RCRA Facility Investigation Work Plan Addendum No. 2 5/22/2003 2.9 MB 14 min
 
RCRA Facility Investigation Work Plan: Addendum No. 3 3/23/2004 1.3 MB 6 min
 
RCRA Facility Investigation Work Plan: Addendum No. 4 5/6/2004 28.7 MB 145 min
 
RCRA Facility Investigation Work Plan: Addendum No. 5 7/26/2004 10.1 MB 51 min
 
RCRA Facility Investigation Work Plan: Addendum No. 6 9/27/2004 4.8 MB 24 min
 
RCRA Facility Investigation Work Plan: Addendum No. 7 11/23/2004 4.8 MB 24 min
 
RCRA Facility Investigation Work Plan: Addendum No. 8 3/11/2005 6 MB 30 min
 
RCRA Facility Investigation Work Plan: Addendum No. 9 7/5/2005 11.7 MB 59 min
 
RCRA Facility Investigation Work Plan: Addendum No. 10 8/19/2005 10.3 MB 52 min
 
RCRA Facility Investigation Work Plan: Addendum No. 11 8/17/2005 5.5 MB 27 min
 
RCRA Facility Investigation Work Plan: Addendum No. 12 12/6/2005 1.3 MB 6 min
 
RCRA Facility Investigation Work Plan: Addendum No. 13 4/20/2006 8 MB 40 min
 
Bedford RFI Technical Memorandum 1: 2001 Stream Investigation Data Summary 3/19/2002 62.7 MB 318 min
 
Bedford RFI Technical Memorandum 1, Addendum: 2002 Highflow Surface Water Sampling 3/27/2003 0.4 MB 2 min
 
Environmental Indicator CA 725 Report 1/24/2005 6.5 MB 33 min
 
Technical Memorandum RCRA Facility Investigation (RFI) Soil; Sediment; Surface Water; Wipe Sampling 4/18/2005 82.8 MB 420 min
 
Consolidated HASP Revision 2 6/24/2008 5.6 MB 28 min
 

Stream Investigation Reports
Stream Investigation Work Plan 6/6/2001 1.4 MB 7 min
 
Stream Investigation Field Sampling Plan 9/21/2001 4.5 MB 22 min
 
Bedford Stream Investigation High Flow Sampling Memorandum 5/12/2002 0.1 MB < 1 min
 
Technical Memorandum Phase II Stream Investigation 2/11/2003    
 

Interim Measures
RCRA Corrective Action Program Interim Measures Alternatives Review Report - East Plant Area 4/13/2005 110.2 MB 559 min
 
U. S. EPA, Region V - East Plant Area Interim Measures Statement of Basis 5/31/2005 0.2 MB 1 min
 
Final (100%) Design - Grading Areas 1 and 2 for the East Plant Area Interim Measure 6/10/2005 5.5 MB 27 min
 
Design Report Over 50 mg/kg PCB Soil Removal - East Plant Area 5/26/2006 30.4 MB 154 min
 
Western Tributary Interim Measure Work Plan 2/14/2006 15 MB 76 min
 
Northern Tributary Interim Measure Work Plan 2/14/2006 14.1 MB 71 min
 
East Plant Area Cover System Final Design 4/18/2008 11 MB 55 min
 
Proposed Grading Areas 3 and 4 Pre-Final Design Drawings 1/16/2006 4.5 MB 22 min
 
Parcels 201 and 204 Interim Measures Work Plan 5/16/2008 14.7 MB 74 min
 

Technical Memorandum
RFI Addendum No. 12 Technical Memo 7/21/2006 2.7 MB 13 min
 
RFI Addendum No. 9 Technical Memo 7/24/2006 20.1 MB 102 min
 
RFI TM Addenda No. 3 Through 7 5/3/2007 25.9 MB 131 min