top of page
Investigation Tools
-
GM is currently performing activities to implement the remaining interim measures at the Facility as well as operation monitoring and maintenance per RCRA Corrective Action Program.
-
This includes the use of various scientific techniques to obtain samples such as soil and water which can be analyzed for contaminants.
-
Some of these tools are:
INVESTIGATIVE DRILLING



Drilling Activity at the GM Bedford Plant
View of Rock Core
Stratigraphic Log for Bedrock Monitoring Well
GROUNDWATER SAMPLING

Typical Groundwater Monitoring Well Design

Typical Groundwater Monitoring Well
(PVC Construction)

Typical Groundwater Sampling Activities
MULTI-MEDIA SAMPLING

Surface Water Sampling In October 2001

Soil Sampling with Soil Probe in January 2002

Hay Sampling in February 2002
bottom of page